Ellen Fairclough Window and Brick Renewal Investigation
Cion and NORR were retained by Ellen Fairclough building to complete the engineering intrusive investigation of brick masonry failure and window deterioration.
Cion and NORR were retained by Ellen Fairclough building to complete the engineering intrusive investigation of brick masonry failure and window deterioration.
Cion was retained in 2018 to assess fenestration renewal completed by a previous consultant and contractor at the penthouse levels of the 222 The Esplanade building in Toronto, ON. The previous project by the previous Consultant had been drastically overbudget and the cause of a special assessment.
Cion was retained by Wilson Blanchard Management Inc. to provide engineering services in order to solve the accessibility access challenges at this multi-unit residential building.
Cion was retained by Durham Standard Condominium Corporation No. 214 to provide engineering services regarding the replacement of the roof-top make-up air units.
Cion and NORR provide consulting services for the replacement of the existing loading dock apron at the Canada Post Edmonton Mail Processing Plant (EMPP) in Edmonton, Alberta.
Cion was selected to conduct building condition assessments (BCA’s) for a portfolio of 16 educational institute facilities operated by 7 separate Indigenous educational institutes.
Cion Corp was retained by the Corporation to prepare contract documents, tendering of the project to pre-qualified contractors and to provide contract administration services. The three-storey townhouses have sloped
Cion Corp was retained by the Board of Directors at BCC #21 to perform engineering services related to the investigation / design, preparation of project specifications and drawings, and
Cion Corp. has completed the two of three phases for the City of Brampton BCA project, a portfolio consisting of over 150 properties. Cion prepared detailed BCAs for the
Cion Corp and NORR were retained by CAMH to provide a feasibility study for the replacement of the glazing systems at 250 College Street West. As part of the
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |